Key numbers

350

MWdc installed capacity

750,000

MWh (Megawatts) renewable energy supplied per year

129,000

homes powered (equivalent)

572,000

tonnes of carbon emissions saved

352,000

cars off the road (equivalent)

Current status

Site selection

Preliminary assessments, site design & community consultation

Planning application

Discharge of planning conditions

Construction

Operation

Decommissioning

A 350MWdc solar farm project and battery energy storage system (BESS)

Our Lower Wonga Solar Farm project is a permitted project which consists of an approximately 350MWdc solar farm and large battery energy storage system (BESS), located next to the Woolooga Powerlink Substation at Wide Bay Highway, Lower Wonga.

The solar project received development approval from the Gympie Regional Council in 2017. Lightsource bp became the developer of the project in 2023 and and has recently received approval for a minor change to the permit. This solar project is adjacent to our existing Woolooga Solar Farm and will be developed over approximately 600 hectares.

solar battery storage

More information

You can find more information in our Community Update leaflet below.

Get involved

At Lightsource bp, our goal is to create solar assets that communities can be proud of, so if you’ve got an opinion or wish to provide feedback regarding the development, please don’t hesitate to let us know by calling 1800 570 663, emailing lowerwongaproject@lightsourcebp.com or using the feedback form below. We’ll aim to get back to you within five working days.

Get in touch

At Lightsource bp, our goal is to create solar assets that communities can be proud of, so if you have an opinion or wish to provide feedback regarding the development, please don’t hesitate to get in touch.

lowerwongaproject@lightsourcebp.com 1800 570 663

*Indicates required field