Site selection
Preliminary assessments & site design
Planning application
Discharge of planning conditions
Construction
Operation
Decommissioning
Wellington solar
This project consists of a 200MWdc solar farm at Goolma Road, Wuuluman. Construction on this project commenced in December 2019. Interested parties will be able to find all the information they need about the Wellington solar project here.
The solar farm is situated on 316 hectares of grazed agricultural land, which has predominantly been used for sheep and cattle grazing (pictured left).
This solar farm is adjacent to our 400MWdc Wellington North solar project. Once operational, the combined installed capacity of both projects create a 600MWdc hub.
Take a look at our video below:
Wellington solar – Government Approval Documents
Layout Plans
Final layout plans for the development
Development Consent
Development Consent (25 May 2018)
Consolidated Development Consent (Mod 1, 11 Dec 2019)
Consolidated Development Consent (Mod 2, 3 Apr 2020)
Management Plans
Environmental Management Strategy
Biodiversity Management Plan
Traffic Management Plan
Cultural Heritage Management Plan
Stormwater Management Plan
Landscape Plan
Fire Emergency Response Plan
Independent Environmental Audits
Construction Independent Environmental Audit
Operation Independent Environmental Audit
Environmental Impact Statement
Environmental Impact Statement
EIS Appedix A – EA Requirements
EIS Appendix B – Proposed Layout
EIS Appendix C – Consultation
EIS Appendix D – Biodiversity
EIS Appendix E – Aboriginal Cultural Heritage
EIS Appendix F – Visual
EIS Appendix G – Noise
EIS Appendix H – Noise Management
EIS Appendix I – Environmental
EIS Appendix J – Hydrological
EIS Appendix K – Mineral Titles
Response to Submissions
RTS Wellington SF_RTS
RTS Appendix A – Mitigation Measures
RTS Appendix B – Additional Traffic Counts
RTS Appendix C – Biodiversity Offset Strategy
RTS Appendix D1 – Geotechnical Report
RTS Appendix D2 – Soil Survey
RTS Appendix E – Hydrological and Hydraulic Analysis
RTS Appendix F – Aboriginal Cultural Heritage Assessment Report
RTS Appendix G – Mayors Letter of Support
RTS Appendix H – Updated Constraints Map
RTS Appendix I – Council Consultation
RTS Appendix J – Modeling Resources Correspondence
RTS Appendix K – Drummond West Correspondence
RTS Appendix L – Boral Correspondence
Modification 1 – Substation Expansion
Mod 1 Application Report – Substation Expansion
Mod 1 Amendment Letter
Mod 1 Amendment Letter Annex A – Drawings
Mod 1 Amendment Letter Annex B – BAM Credits
Mod 1 Amendment Letter Annex C – RAP Consultation
Mod 1 Amendment Letter Annex D – General Layout
Mod 1 DPIE Assessment Report
Mod 1 Consolidated Consent
Mod 1 Instrument of Modification
Modification 2 – Revised Project Layout
Mod 2 Modification Report with Appendices v2.2
Mod 2 Amendment Letter_19032020
Mod 2 Amendment Letter_24032020
Mod 2 DPIE Assessment Report
Mod 2 Consolidated Consent
Mod 2 Instrument of Modification
Get involved
At Lightsource bp, our goal is to create solar assets that communities can be proud of, so if you’ve got an opinion or wish to provide feedback regarding the development, please don’t hesitate to let us know by calling 1800 570 663 or using the feedback form below. We’ll aim to get back to you within five working days.
Get in touch
We are always on hand to assist with any enquiries. You can contact us via email or phone our customer services team.
wellington@lightsourcebp.com 1800 570 663*Indicates required field