UNITED STATES

Ballygammane Energy Storage

80MW/320MWh

installed capacity

48

battery containers

10

acres of land

40yr

operational life

Site selection

Preliminary assessment & design

Planning application

Discharge of planning conditions

Construction

Operation

Decommissioning

Lightsource bp is working on a proposal for an energy storage project at Ballygammane, Thurles, Co. Tipperary. We will fund and develop a 80MW/320MWh (4-hour duration) energy storage project connected into the local electricity network. The project will facilitate the integration of renewable energy into the grid, helping to support low-cost electricity and the enhanced reliability of the electricity grid.

We’ve chosen this site after careful consideration, and we’re now undertaking a wide range of environmental assessments to help shape our plans. These include landscape and visual, heritage and archaeology, ecology and ornithology, flooding and more.

A key part of developing plans for the energy storage project is engaging with local communities, so we’ve sent out a leaflet sharing our plans to addresses surrounding the project, and are keen to encourage people to get in touch to share their thoughts.

Our proposal

Our plans are being finalised following feedback from the community information event and the results of our environmental and planning assessments. These are our current thoughts.

Get in touch

Members of the Lightsource bp team are available to contact, and will answer any questions about the proposal from local residents and interested parties.

ireland@lightsourcebp.com (0)1 685 6263

*Indicates required field