Glorit solar
179
MWdc installed capacity
288,000MWh
(Megawatts hours) renewable energy supplied per year
40,000
homes powered (equivalent)
Site selection
Preliminary assessments, site design & community engagement
Planning application
Discharge of planning conditions
Construction
Operation
Decommissioning
A proposed 179MWdc solar farm north of Auckland
The Glorit Solar Farm is a 179MWdc project on the Kaipara Coast, north of Kaukapakapa, Auckland. Lightsource bp and Contact Energy will develop the solar farm, which is expected to have an operational life of at least 35 years. The site will connect to the existing Transpower 220kV transmission network via a 1.5km dedicated connection from the site to the transmission network. We are working closely with Transpower on this grid connection point.
We have recently submitted the planning application to the Environmental Protection Authority under the Resource Management (Natural and Built Environment and Spatial Planning Repeal and Interim Fast-track Consenting) Act 2023. The application is expected to be open for comment in early 2025.
Get in touch
We are always on hand to assist with any enquiries. You can contact us via email or phone our customer services team.
gloritproject@lightsourcebp.com 0800 225 513*Indicates required field