GLOBAL

Solar Installation to Power NSG Group

Europe’s Leading Solar Energy Generator Submits Formal Planning Application for Solar Installation to Power NSG Group

Lightsource BP, Europe’s leading solar energy generator has submitted a formal planning application to West Lancashire Borough Council to develop a solar installation that will power the operations at NSG Group’s European Technical Centre, in Lathom, Lancashire. Lightsource BP plans to fund, develop and operate a solar installation that will be hard-wired directly into NSG Group’s electricity network.

The proposed solar installation has an output power capacity of 2.5MWp (Megawatts-Peak) – enough clean solar energy to power the equivalent of 720 homes. If approved this will provide approximately 30% of the centre’s annual electricity demand. The majority of the proposed solar installation will be erected on 10 acres of land just to the south of the centre, with a smaller installation within the Technical Centre’s grounds.

The planning application follows a community information event held at the NSG Technical Centre in January 2018 and a number of environmental assessments, which have helped shape the final designs and management plans. This includes amendments to the layout to avoid impacts on identified archaeological features, finalised landscaping and habitat creation measures, and updated construction management plans, including ensuring construction traffic avoids Spa Lane.

Lightsource BP and NSG Group appreciate the important heritage of Lathom House and the use of its grounds as a remount station during World War One. As part of the thorough assessment process heritage experts undertook a geophysical survey, which was reviewed in light of the reports regarding the possibility of a war horse burial site being present on the proposed land in February 2018. This found no evidence of horse burials within the proposed development site.

In response to concerns raised in the local community, a second geophysical survey was commissioned following Easter with a second firm. The results of this second survey confirmed evidence of barracks or stable blocks and an exercise track, but no subsurface earthworks consistent with a horse burial within the proposal site. Lightsource BP have amended the layout and agreed a construction methodology with the County Archaeologist to avoid impacts on these identified archaeological features.

As part of NSG Group’s drive to improve their sustainability credentials, the solar installation will help meet carbon reduction targets, saving an estimated 908 tonnes of carbon emissions each year – the equivalent of taking 193 family cars off the road.

The application has been validated and is available to view on the Council website using the following reference number 2018/0409/FUL. Click here to view the information pack.

Nick Boyle, CEO at Lightsource BP, said: “We’re delighted to have submitted a planning application alongside NSG to develop a solar installation to generate clean electricity for their European Technical Centre, in Lathom. We have been sharing plans for the site with the local community through public events and leaflets and have been encouraged by the largely positive response. The majority of the feedback has been supportive of our proposal, which would generate enough clean solar energy to meet 30% of the electricity needs of the Technical Centre, an important local employer.”

News

29 Apr, 2024

Financing of €315.34 million for Lightsource bp 560MWp solar project in Greece

This deal marks a key milestone for Lightsource bp’s growth in Europe and in Greece.

Read Story

29 Apr, 2024

Lightsource bp celebrates World Day for Safety and Health at Work 2024

We’re celebrating World Day for Safety and Health at Work 2024, exploring the impacts of climate change on occupational safety and health.

Read Story

26 Apr, 2024

Be the change: Lightsource Foundation shortlisted for three awards

The Lightsource Foundation has been shortlisted for three awards at both the Business Charity Awards, and Better Society Awards.

Read Story

25 Apr, 2024

Experts in the field: Agriculture and solar working together

The mutually beneficial relationship between solar energy and agriculture can take many different forms.

Read Story

24 Apr, 2024

Behind the scenes at Lightsource bp’s first battery energy storage project

Our Tiln battery project has now been energised. Here’s why this is a key milestone in our mission to build a renewable-powered grid. 

Read Story

19 Apr, 2024

Brazil’s Milagres Solar ranked in the top 10 for energy generation

Among the 13GW of utility-scale solar farms in operation in Brazil, two of Lightsource bp’s Milagres solar farms have ranked in the top 10 for renewable energy generation.

Read Story

19 Apr, 2024

What is Biodiversity Net Gain, and how will it help nature?

Nature is vanishing at an alarming rate. This is no less than a crisis, with biodiversity loss affecting public health, food security, and efforts to curb climate change.

Read Story

16 Apr, 2024

Do solar panels work on cloudy days?

Solar panels continue to generate renewable electricity even on gloomy days, but how does this work and what effect does cloud have on generation?

Read Story

09 Apr, 2024

World Economic Forum brief: Clean energy as a catalyst for a nature-positive energy transition

World Economic Forum brief examining how building renewable energy can help biodiversity and leave ecosystems in better shape than they found them.

Read Story

08 Apr, 2024

Solar summits to task force – Lightsource bp’s 2024 Q1 event highlights

We hit the ground running to kick off 2024 at Lightsource bp. Here's a glimpse of the highlights from a range of events we have been a part of so far.

Read Story